Prime Concrete PumpingConcrete contractor in Victoria, BC
Prime Concrete Pumping is a concrete contractor at 655 Coleos Pl, Victoria, BC V8Z 6G8, ranked #11 of 44 concrete contractors in Victoria and rated 4.3 from 6 Google reviews.
Victoria, BCUpdated 0 paid placements in any rankingHow we rank
Key facts
| Address | 655 Coleos Pl, Victoria, BC V8Z 6G8Get directions |
|---|---|
| Phone | (250) 658-9336 |
| Google rating | 4.3 from 6 Google reviews |
Trades
Each trade shows the evidence we matched it on.
- Concretemain tradeGoogle main category
Service area
Serves Victoria and 6 towns within 40 km: Oak Bay, Colwood, Langford, North Saanich, Sooke and Salt Spring Island.
Typical concrete work prices
| Job | Low | Typical | High |
|---|---|---|---|
| Concrete drivewayPer driveway: typical range of customer-reported projects (about $8 to $20 per sq ft). US national range converted at 1.4054 CAD per USD (Bank of Canada, October 20, 2026) | CA$3,790 | CA$8,990 | CA$20,380 |
Market ranges for the trade, checked October 2026, not a quote from this business. Ask for a written estimate.
Compare nearby concrete contractors
| Business | Rank | CR Score | Google rating | License verified | Saturday | Sunday | Distance away |
|---|---|---|---|---|---|---|---|
| Prime Concrete Pumping (this business) | — | 57 | 4.3 (6) | — | — | — | |
| Steller Concrete Ltd. | #9 | 57 | 4.7 (39) | — | No | No | 12.3 km |
| Trio Ready-Mix Victoria | #10 | 57 | 4.2 (10) | — | Yes | No | 3.3 km |
| Valcourt Designs BC | #12 | 56 | 4.0 (7) | — | Yes | Yes | 11.0 km |
Reviews
ContractorsRanked reviews
No ContractorsRanked reviews yet
4.3from 6 Google reviews
Hired Prime Concrete Pumping? Write a review
Questions about Prime Concrete Pumping
How is Prime Concrete Pumping ranked in Victoria?
What areas does Prime Concrete Pumping serve?
What do Google reviews say about Prime Concrete Pumping?
How do I contact Prime Concrete Pumping?
Own Prime Concrete Pumping? Claim this profile.
Claiming is free. Correct your hours, trades and service area. The CR Score is recalculated from corrected data; payment never changes it.