Pace Design and ConstructionKitchen remodeler in Washington, D.C., DC
Pace Design and Construction is a kitchen remodeler at 1140 3rd St NE Fl 2, Ste 200, Washington, DC 20002, rated 5.0 from 16 Google reviews. Open Monday to Friday.
Washington, D.C., DC0 paid placements in any rankingHow we rank
Key facts
| Address | 1140 3rd St NE Fl 2, Ste 200, Washington, DC 20002, Washington, D.C., DCGet directions |
|---|---|
| Phone | (888) 711-7223 |
| Website | buildingwithpace.com |
| Hours | Monday to Thursday: 9 AM – 5 PM; Friday: 9 AM – 4:30 PM |
| Google rating | 5.0 from 16 Google reviews |
Trades
Each trade shows the evidence we matched it on.
- Kitchen Remodelmain tradeGoogle main category
- Bathroom Remodeladditional Google category
Service area
Serves Washington, D.C. and 3 towns within 25 miles: Shaw, Adams Morgan and Chevy Chase.
Opening hours
| Day | Hours |
|---|---|
| Monday | 9 AM – 5 PM |
| Tuesday | 9 AM – 5 PM |
| Wednesday | 9 AM – 5 PM |
| Thursday | 9 AM – 5 PM |
| Friday | 9 AM – 4:30 PM |
| Saturday | Closed |
| Sunday | Closed |
- Open evenings — no
- Open Saturdays — no
- Open Sundays — no
Typical kitchen remodeling prices
| Job | Low | Typical | High |
|---|---|---|---|
| Kitchen remodelPer project: typical range of customer-reported remodels (about $75 to $250 per sq ft). US national range × 1.00 South Atlantic factor (2025 Cost vs. Value Report) | $14,650 | $27,090 | $41,780 |
Market ranges for the trade, checked October 2026, not a quote from this business. Ask for a written estimate.
Reviews
ContractorsRanked reviews
No ContractorsRanked reviews yet
5.0from 16 Google reviews
Hired Pace Design and Construction? Write a review
Questions about Pace Design and Construction
What are Pace Design and Construction’s hours?
What areas does Pace Design and Construction serve?
What do Google reviews say about Pace Design and Construction?
How do I contact Pace Design and Construction?
Own Pace Design and Construction? Claim this profile.
Claiming is free. Correct your hours, trades and service area. The CR Score is recalculated from corrected data; payment never changes it.